TATSUTAYAMA 2nd CLAY MINING
LINE
-Closing Reort 10/10/2009
2nd rotating layout is roll out!
1st one is logging layout. This time theme is
clay mining. Top stage is 15gauge manpowered track. Ore shoot is Grandt Line. 2nd
stage is 2ft(6.5mm)gauge diesel powered track. And 3rd stage is main narrow line. The
gauge is 30(9mm). From 2nd to 3rd, ore is dropped, and piled up. Ditcher loads it
into the narrow main line wagon.
This ditcher is Weisman Model Services AH&D Ditcher. I installed motor powered full
working mechanism in it and under ground. Power shovel working is captivates me, I forget
at time.
![]() |
![]() |
![]() Newly, I built office house. |
???????????? |
Ditcer is completed |
![]() ![]() I lathed pulley for full working. |
![]() Full working scine. Movie is here. http://www.youtube.com/watch?v=QUqEBbx7dTs |
![]() ![]() Power train has 4 layer axis. |
![]() ![]() Real power unit is under ground. |
![]() Finaly, I installed motor power. |
-Progress Report 09/19/2008
![]() |
Im
planning to display this layout at Japanese Narrow Gauge Festival Keiben-Sai
on Octorber 5th in Tokyo. Im
trying to add one structure and some Trees and bush. |
h![]() |
8/10/2008
Joining
JAM Exhibition Added
simple mountain and two structures, 6.5mm gauge dump truck train is running smoothly. Ore
chute is Grandt Line kit assembling and engine house is Joe Works kit assembling. |
![]() |
-
Starting Constructing 05/06/2008
![]() |
Using TATSUTAYAMA Logging Tram Way IWATO Line Layout base,
2nd clay mining line is under construction. |
|
![]() |
![]() Wood scratched timber trestle and scratched switch with code 40. Upper line
is 2ft (1/87 6.5mmgauge) and lower is HOn30. |
|
Copyright 1997 Haruhiko Suga
,10/10/2009